**SP105** * The default is monitor is Display 1 and overhead is display 2 /* * To 'mirror' the monitor to the overhead, from linux cmd prompt "**mirror_105**" */ ** SP307 ** * The system near the server room has an output connection to the CRESTRON. There is no projector but there is a flat panel TV mounted on the wall in this room. **SP309** * The left monitor is the primary display, right monitor is Display 2 and overhead is Display 3 /* * To 'mirror' the right monitor to the overhead, from linux cmd prompt "**mirror_309**" */ ** SC006 (Agile Computing Lab) ** * The desktop display (not the AIO computer) is what mirrors to the projector. The DP-out from the computer runs to a DP-HDMI converter box located at the top of the stack of electronics in the CRESTRON rack. The signal gets split and passed to both the desktop display and the projector. **NOTE: The CRESTRON connections are native HDMI everywhere.** ** All rooms have an HDMI cable to connect to a laptop.**